{"id":84683,"date":"2026-07-13T09:15:26","date_gmt":"2026-07-13T09:15:26","guid":{"rendered":"https:\/\/new.energy-wind.md\/?p=84683"},"modified":"2026-07-13T09:15:26","modified_gmt":"2026-07-13T09:15:26","slug":"proiect-eolian-2-mw","status":"publish","type":"post","link":"https:\/\/new.energy-wind.md\/en\/proiect-eolian-2-mw\/","title":{"rendered":"Proiect eolian \u2013 2 MW"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Dezvolt\u0103m un proiect eolian cu o capacitate instalat\u0103 de <strong>2 MW<\/strong>, conceput pentru produc\u021bia eficient\u0103 de energie regenerabil\u0103 \u0219i integrarea \u00een Sistemul Electroenergetic Na\u021bional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Proiectul include toate etapele necesare implement\u0103rii:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Studiu de fezabilitate \u0219i analiz\u0103 a poten\u021bialului eolian;<\/li>\n\n\n\n<li>Proiectare tehnic\u0103 \u0219i documenta\u021bie complet\u0103;<\/li>\n\n\n\n<li>Ob\u021binerea avizelor \u0219i autoriza\u021biilor;<\/li>\n\n\n\n<li>Furnizarea \u0219i instalarea turbinei eoliene;<\/li>\n\n\n\n<li>Racordarea la re\u021beaua electric\u0103;<\/li>\n\n\n\n<li>Punerea \u00een func\u021biune \u0219i testarea instala\u021biei;<\/li>\n\n\n\n<li>Mentenan\u021b\u0103 \u0219i monitorizare pe termen lung.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Acest proiect reprezint\u0103 un exemplu al angajamentului nostru de a livra solu\u021bii energetice moderne, fiabile \u0219i sustenabile, adaptate cerin\u021belor investitorilor \u0219i pie\u021bei energiei regenerabile.<\/p>","protected":false},"excerpt":{"rendered":"<p>Dezvolt\u0103m un proiect eolian cu o capacitate instalat\u0103 de 2 MW, conceput pentru produc\u021bia eficient\u0103 de energie regenerabil\u0103 \u0219i integrarea \u00een Sistemul Electroenergetic Na\u021bional. Proiectul include toate etapele necesare implement\u0103rii: Acest proiect reprezint\u0103 un exemplu al angajamentului nostru de a livra solu\u021bii energetice moderne, fiabile \u0219i sustenabile, adaptate cerin\u021belor investitorilor \u0219i pie\u021bei energiei regenerabile.<\/p>","protected":false},"author":1,"featured_media":83939,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":"","footnotes":""},"categories":[141],"tags":[],"class_list":["post-84683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proiecte"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/posts\/84683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/comments?post=84683"}],"version-history":[{"count":1,"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/posts\/84683\/revisions"}],"predecessor-version":[{"id":84684,"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/posts\/84683\/revisions\/84684"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/media\/83939"}],"wp:attachment":[{"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/media?parent=84683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/categories?post=84683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new.energy-wind.md\/en\/wp-json\/wp\/v2\/tags?post=84683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}